Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»3 coaches for Bengaluru Metro’s Electronic City corridor shipped from West Bengal, more to follow | Bangalore News
Local News

3 coaches for Bengaluru Metro’s Electronic City corridor shipped from West Bengal, more to follow | Bangalore News

May 1, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Bengaluru Metro Wednesday stated three Metro vehicles for the third trainset of Namma Metro’s Yellow Line had been dispatched from Titagarh Rail Techniques’s manufacturing facility in West Bengal’s Uttarpara Tuesday. The remaining three coaches for the third trainset are scheduled to be loaded and transported to Bengaluru by Could 2 and are anticipated to reach within the metropolis between Could 10 and Could 15, in keeping with BMRCL officers.

BMRCL attributed the partial cargo of the third practice set to logistical challenges, particularly the non-availability of specialised transport trailers required to hold the outsized metro vehicles.

A BMRCL spokesperson instructed The Indian Specific, “Because of the restricted availability of trailers, solely three vehicles could possibly be dispatched initially. The remaining three shall be loaded and transported by tomorrow (Friday) as we safe further trailers.”

Story continues beneath this advert

Crucial checks will observe the dispatch of the third trainset earlier than it comes up for inspection by the Commissioner of Metro Railway Security (CMRS).

The Yellow Line of Bengaluru Metro is 9.15 km lengthy and connects RV Street to Bommasandra by way of Digital Metropolis. In January this 12 months, Titagarh delivered the primary ‘made-in India’ driverless trainsets for the Yellow Line. Earlier than that, the primary prototype trainset arrived in February 2024 from China.

Festive offer

BMRCL managing director Maheshwara Rao has written to the CMRS requesting that the Yellow Line be inspected earlier than it may be opened up for industrial operations. In line with BMRCL officers, if all the things goes as deliberate, the road is predicted to be operational by the tip of Could or the primary week of June.

BMRCL is planning to function the road with three trainsets at a frequency of 20-40 minutes, relying upon the ridership.

Story continues beneath this advert

Whereas the civil works for the Yellow Line are principally full, it has confronted quite a few challenges, together with delayed supply of trainsets, geopolitical points, manufacturing challenges, and a subsequent delay within the launch.

© The Indian Specific Pvt Ltd



Source link

Bangalore Bengal Bengaluru city coaches Corridor Electronic follow Metros news shipped West
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Snap unveils SPECS AR glasses, betting on a future beyond smartphones | Technology News

June 17, 2026

X back online after brief downtime, marking second outage in less than 24 hours | Technology News

June 17, 2026

FIFA World Cup 2026, Argentina vs Algeria Football LIVE Score: Messi to play 200th game for Argentina today | Football News

June 17, 2026

Astronomers just found a ‘stellar Rosetta Stone’ that could finally decode deep space’s weirdest signals | Technology News

June 17, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

‘Not yet. I think…’ England coach Thomas Tuchel on singing national anthem

June 17, 2026

Inside the Terrifying Moment That Saved Barry Manilow’s His Life

June 17, 2026

Snap unveils SPECS AR glasses, betting on a future beyond smartphones | Technology News

June 17, 2026

Mark Cuban has a blunt response to Coinbase CEO

June 17, 2026
Popular Post

Latam M&A expected to recover in 2023, IPOs may take longer

Samsung Galaxy A16 5G vs Galaxy A15 5G Review: Which Phone is Better?

Ex-Prince Andrew ‘Set to Shatter His Mother Queen Elizabeth’s Legacy’

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.