Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»‘Critical for city, yet stuck’: MP Tejasvi Surya slams delays in Bengaluru Suburban Railway Project | Bangalore News
Local News

‘Critical for city, yet stuck’: MP Tejasvi Surya slams delays in Bengaluru Suburban Railway Project | Bangalore News

May 17, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Bangalore South MP Tejasvi Surya expressed frustration over the sluggish progress of the Bengaluru Suburban Railway Undertaking (BSRP) throughout a Public Accounts Committee assembly in Delhi on Thursday.

Criticising the shortage of coordination between the railways and the Karnataka state authorities, Surya highlighted the undertaking’s minimal development, important for alleviating Bengaluru’s visitors congestion and offering reasonably priced transport to lakhs of each day commuters.

“The Bengaluru Suburban Railway Undertaking is important for town, but it stays caught with solely a few tenders finalised,” Surya stated, addressing the authorities managing the Rs 15,767-crore, 148-km suburban rail community. Authorized in 2022, the undertaking’s completion has been delayed to 2027 because of stalled corridors.

Story continues beneath this advert

Surya urged the railways to prioritise its execution to satisfy Bengaluru’s pressing wants, and raised considerations concerning the underutilised railway traces working at simply 25 per cent capability and the absence of a brand new direct categorical prepare between Bengaluru and Mumbai. “For 30 years, no new direct prepare has been launched between these two financial hubs. The Udyan Specific is the one choice, pushing travellers to costlier flights,” he stated.

Surya additionally demanded the quick introduction of a Superfast Specific and reiterated the necessity for a proposed Excessive-Pace Rail hall connecting Bengaluru, Hubballi, Pune, and Mumbai. “This high-speed hall will rework connectivity and increase North Karnataka’s financial system,” he added.

Festive offer

The MP additional referred to as for increasing Bengaluru’s suburban rail community, doubling important railway traces, upgrading station infrastructure, and bettering integration between railway and metro stations. “These long-pending initiatives deserve critical consideration, and the railways should act at once,” Surya urged.

The delay within the Bengaluru Suburban Railway Undertaking has additionally obtained intensive backlash from civic teams. Many have identified that the works on corridors 2 and 4 have stopped, with no readability but from Okay-RIDE, which is implementing the undertaking.

Story continues beneath this advert

“BSRP is slated to supply the third choice of public transport after bus and Metro. Sadly, BSRP has already confronted quite a few delays on numerous grounds. A traditional instance is: work on an important Hall 1 (to Airport Terminal) is but to start, 55 months after sanction. The current standing doesn’t bode effectively for town and is certain to not solely delay additional the answer however will even result in value escalations,” Rajkumar Dugar, convenor of Residents 4 Residents discussion board, stated.

A December 2024 skilled committee report from the Indian Institute of Science additionally states that just about 20 lakh individuals will instantly profit from utilizing BSRP corridors for his or her each day commute.



Source link

Bangalore Bengaluru city critical delays news project railway slams Stuck suburban Surya Tejasvi
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Meta partners with Reliance to build AI-powered data centre in India | Technology News

June 10, 2026

Snowflake expands AI offerings with new development and governance tools | Technology News

June 10, 2026

Indians lose up to Rs 28K crore per year to dark patterns; Nykaa, BigBasket among worst offenders | Technology News

June 10, 2026

Tech updates (June 9, 2026): ASUS battery support expansion, Belkin’s Toy Story-themed iPad case, more | Technology News

June 9, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Meta partners with Reliance to build AI-powered data centre in India | Technology News

June 10, 2026

CrowdStrike warns of increasing Chinese AI cyberattacks on U.S. tech

June 10, 2026

Argentina look like 2022 again. Can Lionel Messi and the old guard win?

June 10, 2026

Jimmy Kimmel Nails Biggest Flaw In Trump’s Conspiracy Theory

June 10, 2026
Popular Post

Razer launches the Kishi Ultra, a full-size mobile controller

University of Northern Colorado President’s son killed in avalanche

Ex-DU professor Saibaba to stay in jail as Supreme Court suspends Bombay HC order acquitting him

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.