Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Technology»Artemis 2 astronauts arrive at Kennedy Space Center as Nasa eyes April 1 Moon launch | Technology News
Technology

Artemis 2 astronauts arrive at Kennedy Space Center as Nasa eyes April 1 Moon launch | Technology News

March 29, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
The astronauts have been in quarantine since March 20, when the mission’s rocket and spacecraft were rolled out to the launch pad. (Image: Nasa)
Share
Facebook Twitter LinkedIn Pinterest Email

4 min learnNew DelhiMar 28, 2026 07:24 PM IST

The crew of Nasa’s extremely anticipated Artemis 2 mission has arrived on the Kennedy House Middle, marking a serious step towards what might be the primary crewed journey across the Moon in additional than 50 years. The 4 astronauts landed on March 27 after flying in T-38 jets from Houston, touching down on the Shuttle Touchdown Facility within the afternoon.

The staff contains Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen. They’re now getting into the ultimate section of preparations earlier than liftoff, which is at present focused for April 1.

“It’s superior to be right here. We love coming right here,” Wiseman stated after touchdown. “About 100 miles away, we stated how a lot we love sliding to KSC.”

Remaining preparations underway

The astronauts have been in quarantine since March 20, when the mission’s rocket and spacecraft had been rolled out to the launch pad. They may stay in isolation till launch, a normal precaution to make sure crew well being forward of spaceflight.

The Artemis 2 mission will use Nasa’s highly effective House Launch System rocket and the Orion spacecraft. The stack is already positioned at Launch Complicated 39B, prepared for ultimate checks and fueling.

Nasa plans to start fueling the rocket on launch day morning, with liftoff scheduled inside a two-hour window that opens at 6.24 pm. EDT. If wanted, backup launch alternatives can be found day by day via April 6, with one other window later within the month.

Mission a long time within the making

Artemis 2 is anticipated to be the primary mission to ship people past low Earth orbit because the Apollo 17 mission in 1972. Though the crew of the mission won’t land on the Moon, they’ll fly by it on a predetermined path known as a free return trajectory. This trajectory naturally leads again to Earth.

Story continues under this advert

The mission is anticipated to take about 10 days. Throughout this era, the crew will check among the main methods on board Orion. These methods embrace life help methods, navigation methods, and communication methods. These methods are important for future missions which are anticipated to land people on the Moon.

Challenges earlier than liftoff

The highway to launch has not been completely clean. Earlier this yr, engineers detected a liquid hydrogen leak throughout a pre-launch rehearsal. Though the problem was resolved, one other technical downside involving helium stream pressured the rocket to be rolled again for additional repairs.

After fixes had been accomplished, the rocket returned to the launch pad, placing the mission again on monitor. Even so, officers have made it clear that security stays the highest precedence, and delays are potential if any new considerations come up.

“We’re not making an attempt to get it proper out of the gate,” officers stated, describing Artemis 2 as a check mission centered on studying and refinement.

Story continues under this advert

The Artemis programme is designed as a long-term effort to return people to the Moon and finally put together for missions to Mars. If Artemis 2 goes as deliberate, the subsequent steps will contain extra complicated missions, together with testing lunar landers and finally making an attempt a crewed touchdown later this decade.

For now, all eyes are on April 1. If the countdown proceeds with out interruption, Artemis 2 will mark a historic return to deep house for human explorers, one thing not seen in over half a century.

 

 

© IE On-line Media Companies Pvt Ltd



Source link

April arrive Artemis Astronauts center eyes Kennedy launch Moon NASA news space Technology
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

What is Eicon, the app looking to make museum visits easier with your camera? | Technology News

June 11, 2026

Android Must Copy Killer iOS 27 Feature ASAP

June 10, 2026

Why Restaurant Owners Are Investing in Contactless Technology

June 10, 2026

Amazon Launches Three New Kindle Scribe eReaders

June 10, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Kai Trump Accused Of ‘Changing The Audio’ On Clip Of Prez Being Booed

June 11, 2026

What is Eicon, the app looking to make museum visits easier with your camera? | Technology News

June 11, 2026

North Carolina treasurer passes on SpaceX citing valuation concerns; favors OpenAI, Anthropic

June 11, 2026

How did Rohit Sharma fare in nets as he returns to Indian team for Afghan ODIs

June 10, 2026
Popular Post

‘It broke my heart” – 2-time WWE World Heavyweight Champion deeply disappointed with Wardlow’s AEW return

Vijay Sales Grand Electronics Sale: Big discounts on phones, tablets and laptops | Technology News

Mike Tyson refuses to say he won’t fight again after Jake Paul defeat

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.