Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»1,700 additional CISF personnel to be posted at Bengaluru airport | Bengaluru
Local News

1,700 additional CISF personnel to be posted at Bengaluru airport | Bengaluru

February 1, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The central authorities of India has sanctioned the deployment of round 1,700 Central Industrial Safety Power (CISF) personnel in Bengaluru’s Kempegowda Worldwide Airport, reported information company PTI. Presently, round 3,500 CISF workers are deployed on the airport in Karnataka’s capital.

In response to the report, The CISF on the airport’s Terminal-1 is engaged in frisking passengers, scanning their cabin baggage and offering a complete armed anti-hijack and counter-terrorist cowl. The newly deployed workers will reportedly work at KIA’s newly opened terminal 2. The recent deployment of safety personnel was required contemplating the truth that the passenger load on the airport will develop and extra check-in counters and services have been created, mentioned the report.

The operations of the newest terminal 2 at Kempegowda Worldwide Airport started on January 15, introduced the administration of Bengaluru airport. A five-lane approach can also be being made prepared for smoother automobile arrivals and departures for choose up and drop of passengers on the airport. Worldwide operations are anticipated to start in April from the newest terminal.

The estimated price of establishing the primary section of terminal 2 is reportedly Rs. 13,000 crores, and it’ll have a built-up space of roughly 2.5 lakh sq. meters. One other 4.41 lakh sq. metres shall be added to the terminal in the course of the second section. The primary section of the brand new terminal is anticipated to serve 25 million passengers a 12 months. On November 11, Prime Minister Narendra Modi inaugurated the newest terminal 2 at Kempegowda Worldwide Airport.

(With inputs of PTI)

Subscribe to our greatest newsletters

Subscribed to publication efficiently

Thanks for subscribing to our Day by day Information Capsule publication.

Source link

Additional Airport Bengaluru CISF personnel posted
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

DHS Secretary Floats Halting Airport Immigration Processing At ‘Sanctuary Cities’

May 27, 2026

PBKS vs RCB Live Score, IPL 2026 Live Cricket Score: Punjab Kings vs Royal Challengers Bengaluru Match

May 17, 2026

Punjab Kings vs Royal Challengers Bengaluru Playing 11 Prediction, Full Squad, Players List, Captain

May 17, 2026

Hardik Pandya ruled out of Mumbai Indians vs Royal Challengers Bengaluru IPL 2026 clash in Raipur

May 10, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Manu Bhaker on Jaspal Rana’s death: ‘Shooting range will never feel same again’ | Sports News

June 12, 2026

Four UFO videos newly declassified by US

June 12, 2026

OJ Simpson Died Haunted By Ghost Of Nicole Brown

June 12, 2026

7 Ways to Make your Phone Battery Last Longer

June 12, 2026
Popular Post

Zero-Covid anger grows after deadly China fire

Top 10 Best Android Card Games

IND vs WI: How Deepti Sharma and Renuka Singh engineered India’s clean-sweep of Windies | Cricket News

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.