Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»India»Ayodhya temple’s 1st floor construction work to start end of June | Latest News India
India

Ayodhya temple’s 1st floor construction work to start end of June | Latest News India

June 15, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The development of the primary flooring of the three-storey Ram Temple in Ayodhya is prone to start by the tip of the month and thework on the bottom flooring is nearing completion, a member of the Shri Ram Janmabhoomi Teerth Kshetra Belief mentioned on Tuesday.

Construction work at Ram temple underway, in Ayodhya (ANI)
Development work at Ram temple underway, in Ayodhya (ANI)

The belief is overseeing the development of the temple which started in 2020.

Additionally learn: Floor flooring of Ram Temple in Ayodhya in closing levels of building

“By the tip of this month, the development of the primary flooring of the temple will most certainly start. Last touches are being given to the bottom flooring. All the building of the bottom flooring is most certainly to be over by October,” the member cited above mentioned, in search of anonymity.

The temple’s basis was laid in an elaborate ceremony presided over by Prime Minister Narendra Modi on August 5, 2020. The development began thereafter and is being monitored by senior functionaries. It was just lately reviewed by a staff led by Nripendra Misra, chairman of the Ram Mandir Development Committee, and comprising members from the engineering groups of Larsen & Toubro, Tata Consulting Engineers, and the belief.

As per the main points offered by the development committee, the temple is 380 ft in size, 250 ft in width and 161 ft excessive from the courtyard. The sanctum sanctorum is unfold over 20 ft.

Based on the belief, 160 pillars have been constructed on the bottom flooring of the temple. Of those, six are fabricated from white Makrana marble from Nagaur district, and the remaining are of pink sandstone from Bansi Paharpur – each in Rajasthan. Makrana marble will even be used for the temple’s flooring, the belief mentioned.

“Aside from the garbha griha (sanctum sanctorum), the temple has 5 mandaps – gudh mandap, rang mandap, nritya mandap, prathana mandap and kirtan mandap. The dome measurement of the 5 mandaps are 34 ft broad and 32 ft lengthy, and the peak from the courtyard ranges between 69 ft to 111 ft,” a second member of the belief mentioned, in search of anonymity.

The second member added that entry to the temple will probably be from the “singh dwar” and the primary halt for the devotees will probably be on the “nritya mandap”. “The gudh mandap simply earlier than the sanctum sanctorum would be the final halt. Devotees won’t be allowed entry contained in the sanctum sanctorum the place solely monks will carry out the rituals,” the member mentioned.

On Monday, the temple authorities mentioned that the development of the sanctum sanctorum is anticipated to be accomplished by the tip of the 12 months, and the inauguration of the grand construction might happen in January subsequent 12 months on a date that’s but to be finalised.

Additionally learn: Ayodhya entry gate to be modelled after Ram Mandir

The belief, in the meantime, mentioned it has despatched an invite to Modi, suggesting three auspicious dates for the opening ceremony. The three auspicious dates shortlisted after consulting astrologers are probably between January 17 and 24, mentioned individuals conscious of the matter.

The belief didn’t disclose the precise dates to the media however mentioned that rituals on the temple can start solely from Makar Sankranti, in accordance with the Hindu calendar.

Source link

1st Ayodhya construction Floor India June Latest news start temples Work
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Audit firm hints at insider trading by former IndusInd Bank officials | Business News

May 9, 2025

Metro fare fixation committee report to be made public soon: BMRCL Managing Director Maheshwara Rao | Bangalore News

May 8, 2025

Day after Operation Sindoor, Tripura CM Manik Saha says India has given befitting response to Pahalgam terror attack | India News

May 8, 2025

Rupee posts biggest single-day loss in over 2 years. Here’s why | Business News

May 8, 2025
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Ethereum Breaks Through and Warms Up — Pairminer Cloud Mining Platform Helps Users Quickly Earn $1,000,000

May 9, 2025

Audit firm hints at insider trading by former IndusInd Bank officials | Business News

May 9, 2025

Anthropic launches Claude web search API, betting on the future of post-Google information access

May 8, 2025

Sanofi exec tells biotechs not to scrimp on clinical trial design

May 8, 2025
Popular Post

Usher Performs At ‘Lovers And Friends’ Show With No Visible Injuries

Long Covid costs patients an average $9,000 a year in medical expenses

What is Android? Android Basics Explained

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2025 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.