Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»World»NASA Delays Crewed Lunar Landing Until 2027 As Trump Prepares For Office
World

NASA Delays Crewed Lunar Landing Until 2027 As Trump Prepares For Office

December 6, 2024No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


Washington:

America is pushing again its deliberate return to the Moon from 2026 to “mid-2027” because it offers with warmth defend points and different troubles plaguing its Orion crew capsule, NASA officers mentioned Thursday.

The announcement comes as President-elect Donald Trump is getting ready to take workplace in January and will considerably reshape the path of the US area company.

Artemis, named after the sister of Apollo in Greek mythology, was formally introduced in 2017 as a part of NASA’s plans to ascertain a sustained presence on Earth’s nearest area neighbor, and apply classes realized there for a future mission to Mars.

Its first mission, an uncrewed check flight to the Moon and again known as Artemis 1, occurred in 2022, after a number of postponements.

However groups reviewing the info later realized that Orion’s warmth defend eroded in sudden methods, and there have been additionally points with its electrical and life assist programs.

“We have been in a position to recreate the issue right here on Earth, and now we all know the foundation trigger, and this has allowed us to plan a path ahead,” NASA administrator Invoice Nelson instructed reporters throughout a press convention.

Artemis 2, involving a crew that won’t land on the lunar floor, has been postponed from September 2025 to April 2026, Nelson instructed reporters.

Artemis 3, during which the primary lady and first individual of shade are to set foot on lunar soil on the Moon’s south pole, ought to now happen in “mid 2027.”

“That will probably be effectively forward of the Chinese language authorities’s introduced intention that they’ve already publicly acknowledged of 2030,” added Nelson.

“The protection of our astronauts is at all times first in our choices. It’s our North Star. We don’t fly till we’re prepared.”

Aside from the troubles plaguing Orion, NASA is ready for Elon Musk’s SpaceX to have a modified model of its Starship prototype rocket to behave as a lunar lander.

Whereas the corporate is making speedy progress, it nonetheless has a protracted option to go in its testing, particularly in proving it could actually perform a fancy refueling process in orbit.

The spacesuits, developed by Axiom, are additionally nonetheless awaited.

Trump on Wednesday nominated on-line funds billionaire and personal astronaut Jared Isaacman to guide NASA.

Specialists anticipate important adjustments could possibly be within the offing — from doubtlessly cancelling the costly Area Launch Programs (SLS) rocket used for Artemis, to presumably scrapping the Moon part altogether, and specializing in Mars.

The announcement comes as President-elect Donald Trump is getting ready to take workplace in January and will considerably reshape the path of the US area company.

Artemis, named after the sister of Apollo in Greek mythology, was formally introduced in 2017 as a part of NASA’s plans to ascertain a sustained presence on Earth’s nearest area neighbor, and apply classes realized there for a future mission to Mars.

Its first mission, an uncrewed check flight to the Moon and again known as Artemis 1, occurred in 2022, after a number of postponements.

However groups reviewing the info later realized that Orion’s warmth defend eroded in sudden methods, and there have been additionally points with its electrical and life assist programs.

“We have been in a position to recreate the issue right here on Earth, and now we all know the foundation trigger, and this has allowed us to plan a path ahead,” NASA administrator Invoice Nelson instructed reporters throughout a press convention.

Artemis 2, involving a crew that won’t land on the lunar floor, has been postponed from September 2025 to April 2026, Nelson instructed reporters.

Artemis 3, during which the primary lady and first individual of shade are to set foot on lunar soil on the Moon’s south pole, ought to now happen in “mid 2027.”

“That will probably be effectively forward of the Chinese language authorities’s introduced intention that they’ve already publicly acknowledged of 2030,” added Nelson.

“The protection of our astronauts is at all times first in our choices. It’s our North Star. We don’t fly till we’re prepared.”

Aside from the troubles plaguing Orion, NASA is ready for Elon Musk’s SpaceX to have a modified model of its Starship prototype rocket to behave as a lunar lander.

Whereas the corporate is making speedy progress, it nonetheless has a protracted option to go in its testing, particularly in proving it could actually perform a fancy refueling process in orbit.

The spacesuits, developed by Axiom, are additionally nonetheless awaited.

Trump on Wednesday nominated on-line funds billionaire and personal astronaut Jared Isaacman to guide NASA.

Specialists anticipate important adjustments could possibly be within the offing — from doubtlessly cancelling the costly Area Launch Programs (SLS) rocket used for Artemis, to presumably scrapping the Moon part altogether, and specializing in Mars.

(Aside from the headline, this story has not been edited by NDTV workers and is revealed from a syndicated feed.)


Source link

Crewed delays landing Lunar NASA office prepares Trump
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Man In Michigan Synagogue Attack Lost Family Members In Israeli Airstrike In Lebanon, Official Says

March 14, 2026

Bahrain and Saudi Arabia GPs to be cancelled amid Middle East war

March 14, 2026

U.S. Economy Grew At Sluggish 0.7% At End Of 2025, Ahead Of Iran War Disruption

March 13, 2026

‘Absolutely Shameful’: Trump White House Torched Over Bowling-Themed ‘AI Slop’ About Iran

March 13, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Man In Michigan Synagogue Attack Lost Family Members In Israeli Airstrike In Lebanon, Official Says

March 14, 2026

The ‘Brutal’ Reason Netflix Parted Ways With Meghan Markle’s Brand

March 14, 2026

Disney+ Verts: A New Vertical Video Feature

March 14, 2026

Where should you put your cash today?

March 14, 2026
Popular Post

Stocks making the biggest moves midday: Nike, Rent-A-Center, Carnival Cruise

7 Outdoor Kitchen Trends and Ideas

Karnataka man killed for questioning harassment of his wife: police

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.