Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»World»Pipeline Section In Kansas With Oil Spill Is Back In Service
World

Pipeline Section In Kansas With Oil Spill Is Back In Service

December 30, 2022No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

TOPEKA, Kan. (AP) — A pipeline operator put a broken part in Kansas again into service Thursday, a bit greater than three weeks after a spill dumped 14,000 bathtubs’ price of crude oil right into a rural creek.

Canada-based T.C. Power introduced that it had accomplished repairs, inspections and testing on its Keystone pipeline in northeast Kansas to permit a “managed restart” of the part from Steele Metropolis, Nebraska, close to the Kansas line, to Cushing, in northern Oklahoma. The two,700-mile (4,345-kilometer) Keystone system carries heavy crude oil extracted from tar sands in western Canada to the Gulf Coast and to central Illinois.

A spill on Dec. 7 shut down the Keystone system after dumping 14,000 barrels of crude oil right into a creek working by means of rural pastureland in Washington County, about 150 miles (240 kilometers) northwest of Kansas Metropolis. Every barrel is 42 gallons, the scale of a family bathtub.

The U.S. Division of Transportation’s pipeline security arm gave TC Power permission final week to restart the part of pipeline after telling the corporate that it must function it at decrease strain than earlier than. The corporate’s announcement disclosed that it nonetheless is working to find out the reason for the spill.

“We acknowledge that incidents like this elevate questions. We’ve questions too. We’re dedicated to asking these robust questions, absolutely investigating and sharing our learnings and actions,” Richard Prior, the corporate’s president for liquids pipelines, stated in an internet message.

“I’ve seen first-hand the care, concern and energy going into our response and restoration . . . we’ll proceed our work till we’ve cleaned up and restored the affected areas.” — Richard Prior, President, Liquids Pipelines, TC Power.
Study extra at https://t.co/CudVkOjpNP. pic.twitter.com/2ETeuyWrJp

— TC Power (@TCEnergy) December 29, 2022

The rupture occurred on native farmer Invoice Pannbacker’s land, and he stated he’s bothered the corporate reopened the part of pipeline when “they haven’t a minimum of given an official trigger” of the accident.

The corporate reported that as of final week, it had recovered virtually 7,700 barrels of the spilled crude oil, or a bit greater than half. The corporate and authorities officers have stated ingesting water provides weren’t affected. Nobody was evacuated, and a lot of the Keystone system was again in operation in eight days.

“We is not going to relaxation till we’ve got recovered and remediated the areas affected by this incident,” Prior stated in his message. “No incident is ever acceptable to us.”

The spill was the biggest onshore in 9 years and bigger than 22 earlier spills on the Keystone system mixed, in accordance with U.S. Division of Transportation knowledge.

“If earlier checks confirmed that all the things was effective and now checks present all the things is okay, but we’ve had failures in between-time, what actual assurance do we’ve got that there’s not one other accident ready to occur?” stated Zack Pistora, who lobbies for the Sierra Membership’s state chapter.

Considerations that spills might pollute waterways spurred opposition to plans by TC Power to construct one other crude oil pipeline in the identical system, the 1,200-mile (1,900-kilometer) Keystone XL, throughout Montana, South Dakota and Nebraska. President Joe Biden’s cancelation of a allow for the challenge led the corporate to tug the plug on the challenge final 12 months.

Related Press author Heather Hollingsworth additionally contributed from Mission, Kansas.



Source link

Kansas Oil pipeline section service Spill
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Aurora police renew call to crack 2014 stabbing death of Aurora man

June 8, 2025

Trump Administration Asks Supreme Court To Leave Mass Layoffs At Education Department In Place

June 8, 2025

US brings Kilmar Ábrego García, mistakenly deported to El Salvador, back to face charges

June 7, 2025

Elephant permit for Colorado Renaissance Festival denied

June 7, 2025
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

6 Things Every Retiree Should Have Prepared in 2025

June 8, 2025

Mevani attacks BJP over atrocities on Dalits, weaker sections in Gujarat | India News

June 8, 2025

‘I really want her to like me’: When Priyanka Chopra Jonas said she hopes daughter Malti Marie takes after her, is ‘proud’ of her choices | Feelings News

June 8, 2025

French Open: Aryna Sabalenka looking forward to ‘Tequila, gummy bears and swimming’ in Mykonos after ‘worst final in my career’ | Tennis News

June 8, 2025
Popular Post

How France became the Premier League’s transfer market of choice

US Jobs Report Likely to Show Subtle Progress for Fed: Eco Week

Colorado’s overdose rates stabilized in 2022, despite fentanyl’s growing dominance

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2025 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.