Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»PM Modi to inaugurate Bengaluru metro Yellow Line, launch Phase-3 expansion on August 10 | Bangalore News
Local News

PM Modi to inaugurate Bengaluru metro Yellow Line, launch Phase-3 expansion on August 10 | Bangalore News

August 3, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Prime Minister Narendra Modi will inaugurate the much-awaited 19.15-km Yellow Line of Namma Metro, connecting RV Highway to Bommasandra, and lay the muse stone for the 44.65-km Part-3 growth of the Bengaluru Metro on August 10.

ARTICLE CONTINUES BELOW VIDEO

The Yellow Line, constructed at a value of Rs 5,056.99 crore, options 16 stations and is predicted to considerably ease visitors congestion, particularly on the infamously congested Silk Board Junction. The road is estimated to cater to almost eight lakh commuters each day, providing main connectivity between key residential and industrial corridors in southern Bengaluru and Digital Metropolis respectively.

As well as, the Prime Minister will launch the Rs 15,611-crore Part-3 growth, which was permitted by the Union Cupboard inside the first 100 days of Modi 3.0. The Bengaluru Metro’s Part 3, also called the Orange Line, is a challenge to broaden the town’s metro community by including 44.65 km of latest traces. The challenge consists of two traces and 31 stations, with an estimated completion date by the top of 2029. Part 3 will primarily serve underserved areas alongside Magadi Highway and the western portion of the Outer Ring Highway (ORR).

Story continues under this advert

The 2 traces will join JP Nagar 4th Part to Kempapura (Hebbal) and Hosahalli to Kadabagere, with a portion additionally passing by Gorguntepalya, Magadi Highway, and Mysuru Highway.

A major a part of the challenge will contain a double-decker viaduct, the place metro tracks will likely be constructed above current roads and flyovers to optimize house

Union Minister for Dwelling and City Affairs Manohar Lal Khattar stated, “I’m happy to announce that the Hon’ble Prime Minister of India has kindly agreed to inaugurate the Yellow Line and lay the muse stone for Part-3 on August 10.”

Calling the event a “landmark second for Bengaluru South,” native MP Tejasvi Surya expressed gratitude to the Prime Minister for prioritising public transport within the area. “With practically Rs 20,000 crore value of Metro infrastructure devoted to this area alone, we’re extremely grateful to PM Modi for his continued focus, affection, and dedication to Bengaluru South’s public transport infrastructure,” he stated.

Story continues under this advert

Collectively, the Yellow Line and Part-3 initiatives are anticipated to profit practically 25 lakh commuters within the southern a part of the town, enhancing general city mobility in Bengaluru.

On August 1,  the Commissioner of Metro Railway Security (CMRS) gave the protection clearance to BMRCL’s Yellow Line, clearing the best way for industrial operations on the stretch. This improvement got here practically eight years after the civil works for the Yellow Line have been awarded in 2017.

BMRCL at present has three trains in its Hebbagodi depot for the Yellow Line with the fourth practice set on its option to Bengaluru.

The Yellow Line has suffered vital delays, primarily resulting from disruptions within the provide of metro coaches. CRRC, the Chinese language agency initially contracted to produce the rolling inventory, failed to satisfy the 75 per cent native manufacturing requirement mandated by the ‘Make in India’ coverage. The problem was exacerbated by the India-China border standoff in June 2020, problems with overseas direct funding (FDI) norms, and Covid-related disruptions.

Story continues under this advert

To resolve the deadlock, CRRC partnered with Bengal-based Titagarh Rail Techniques to fabricate and ship the coaches domestically. Nevertheless, visa delays for Chinese language engineers and the late arrival of propulsion programs from Japan additional slowed down testing and commissioning of the hall.



Source link

August Bangalore Bengaluru expansion inaugurate launch line metro Modi news Phase3 yellow
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Donald Trump Snaps At Fox News Reporter Over ‘Stupid’ Question

March 7, 2026

Google Pixel 10 vs Pixel 10a: A closer look at design, display, and camera upgrades | Technology News

March 7, 2026

Vivo X300 FE India launch expected soon: Check specs, camera, price | Technology News

March 7, 2026

‘Bumrah is just a freak’: Michael Clarke backs India pacer to be decisive in T20 World Cup final | Cricket News

March 7, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Kristi Noem’s In-Laws Hope Husband Bryon Finally Leaves Her Amid Rumors

March 8, 2026

Which AI-Powered Adtech Stock Is the Better Buy?

March 7, 2026

Donald Trump Snaps At Fox News Reporter Over ‘Stupid’ Question

March 7, 2026

Google Pixel 10 vs Pixel 10a: A closer look at design, display, and camera upgrades | Technology News

March 7, 2026
Popular Post

Pakistan yet to decide on invitation for SCO foreign ministers’ meeting by India: Report

Feud erupts as Trump targets MAGA ally Marjorie Taylor Greene

Delhi LG asks top cop to probe Shrinate’s remark on Kangana after BJP files complaint | Latest News India

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.