Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»‘Without toll, there is no tunnel road’: Karnataka DyCM Shivakumar on Bengaluru’s Hebbal-Silkboard Junction tunnel road project | Bangalore News
Local News

‘Without toll, there is no tunnel road’: Karnataka DyCM Shivakumar on Bengaluru’s Hebbal-Silkboard Junction tunnel road project | Bangalore News

July 9, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Karnataka Deputy Chief Minister D Okay Shivakumar stated on Wednesday {that a} tunnel highway for Bengaluru’s Hebbal-Silkboard Junction stretch wouldn’t be doable with out accumulating a toll from customers, including that individuals would pay the toll in the event that they need to save time.

Talking to reporters throughout his two-day go to to New Delhi, Shivakumar stated, “With no toll, no tunnel highway will work out. Different states even have tolls in cities. Even in Bengaluru, tolls are levied on the airport highway, Bengaluru-Mysuru expressway, and NICE hall. If individuals need to save time, they may pay the toll and use the tunnel.”

In June, the Karnataka Cupboard permitted the development of two main tunnel highway corridors in Bengaluru underneath the build-own-operate-transfer (BOOT) mannequin, clearing the way in which for toll-based highway utilization. Beneath the mannequin, chosen non-public gamers will recuperate their funding by means of toll assortment over 30 years.

Story continues under this advert

Shivakumar, who can also be the Bengaluru growth minister, stated that tender works have been underway and that international tenders can be issued by means of a newspaper notification in two to a few days.

On Union minister H D Kumaraswamy’s illustration to Union Highway Transport and Highways Minister Nitin Gadkari on June 24 over constructing underground highway infrastructure for Bengaluru, Shivakumar stated, “I welcome the ideas (by Kumaraswamy). Let anyone take credit score (for the tunnel highway challenge). Even when some funds might be organized, I welcome it. Ultimately, we wish individuals to avoid wasting time and commute quicker.”

The detailed challenge report of Bengaluru’s twin tunnel highway challenge between Hebbal and Silk Board Junction has estimated a toll of Rs 330 for a distance of 16.6 km. The challenge is estimated to price round Rs 18,000 crore.

The report additionally states that tolls for subsequent years are calculated on the premise of a 5 per cent annual improve within the wholesale value index, with a 40 per cent restriction. The bottom 12 months for the toll income is FY 2030-31. Importantly, the toll estimates have been proposed just for automobiles, with no point out of different autos.

Story continues under this advert

Based on the report, a toll of Rs 320 is estimated for Hebbal-Sarjapur/HSR Format (16.3 km), Rs 250 for Hebbal-Hosur Primary Highway (12.79 km), Rs 180 for Hebbal-Seshadri Highway (9.05 km), Rs 320 from Outer Ring Highway, Okay R Puram-Silk Board Junction, Rs 245 for Mekhri Circle to Silk Board Junction (12.54 km), and Rs 195 for Race Course-Silk Board junction (9.8 km).

Additional, the report has additionally estimated tolls of Rs 255 from Jayanagar to Hebbal (13 km), Rs 245 from Jayanagar to Outer Ring Highway and KR Puram (12.36 km), and Rs 130 from C V Raman Highway to Hebbal (6.60 km).

The north–south hall, from Hebbal Esteem Mall Junction to Silk Board KSRP Junction, goes to be developed as an underground tunnel having three intermediate places linked by way of ramps for entry and exit into the primary tunnel. This alignment will join the Hebbal and Silk Board Junction with the three intermediate ramps–at Mekhri Circle, Racecourse, and Lalbagh–decreasing journey time from about 90 minutes to 45 minutes.



Source link

Bangalore Bengalurus DyCM HebbalSilkboard Junction Karnataka news project road Shivakumar Toll tunnel
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

FIDE CEO Emil Sutovsky confirms Candidates chess tournament will go ahead as planned | Chess News

March 15, 2026

Meta unveils new Facebook tools to help creators report copycat content more easily | Technology News

March 15, 2026

Ex-Uber CEO launches robotics startup ‘Atoms’ for mining, transport, and food automation | Technology News

March 15, 2026

Chelsea to approach PGMOL over referee’s bizarre interruption of team huddle | Football News

March 15, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

My Top Growth Stock to Buy for 2026 (and It’s Not Even Close)

March 15, 2026

FIDE CEO Emil Sutovsky confirms Candidates chess tournament will go ahead as planned | Chess News

March 15, 2026

Why Kate Middleton Felt Betrayed by King Charles

March 15, 2026

Meta unveils new Facebook tools to help creators report copycat content more easily | Technology News

March 15, 2026
Popular Post

Multiplex giant PVR posts Q2 net loss of over ₹71 crore: Report

1 Fintech Stock to Buy Hand Over Fist and 1 to Avoid

Jim Cramer Says “Tesla’s Transitioning From Auto Company to Tech Company”

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.