Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»‘2,052 encroachments cleared’: Bengaluru civic body BBMP tells Karnataka HC | Bengaluru
Local News

‘2,052 encroachments cleared’: Bengaluru civic body BBMP tells Karnataka HC | Bengaluru

October 16, 2022No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Bruhat Bengaluru Mahanagara Palike (BBMP) has knowledgeable the Excessive Courtroom of Karnataka that 2,052 encroachments on storm water drains (SWDs) have been eliminated to this point. The HC bench headed by Performing Chief Justice Alok Aradhe was listening to a petition by ‘Residents Motion Group’ and others on Wednesday.

ALSO READ | Couple threatens to self immolate to cease BBMP demolition drive

The Bengaluru civic physique’s Chief Engineer (SWDs) M Lokesh introduced the action-taken report on the problem earlier than the Excessive Courtroom.

ALSO READ | Bengaluru: BBMP razes elements of Nalapad Academy as a part of anti-encroachment drive

The report said that 2,666 encroachments on SWDs (‘Rajakaluves’) have been recognized out of which 2,052 have been eliminated by October 11. Out of the remaining 614 encroachments, 110 points have been in varied courts.

ALSO READ | BBMP engineers’ wages to be withheld if no progress in encroachment removing: Karnataka HC

A complete of 504 encroachments have been but to be cleared. Advocate G R Mohan argued that encroachments made by massive builders and influential politicians weren’t cleared by the authorities.

ALSO READ | Karnataka will get 12 extra weeks to finish delimitation, reservation for BBMP

In the course of the listening to the HC was knowledgeable by the BBMP’s counsel that fifty per cent of the encroachments on the Begur lake has been cleared.

ALSO READ | ‘Influential folks intervene however we’ll take away them’: CM Bommai on encroachments in Bengaluru

The HC directed that an motion taken report on the Begur lake encroachments must be filed earlier than October 14.

SHARE THIS ARTICLE ON

Matters

karnataka
bengaluru
demolition
encroachment
+ 2 extra
karnataka
bengaluru
demolition
encroachment
+ 1 extra



Source link

BBMP Bengaluru body civic cleared encroachments Karnataka tells
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Tina Fey Details ‘Disgusting’ Changes Her Aging Body Has Gone Through

June 9, 2026

U.S. Tells Foreigners To Reapply For Green Cards From Home Countries

May 23, 2026

Meta CEO tells employees he does not expect more company-wide layoffs this year | Technology News

May 21, 2026

‘Sopranos’ Star Opened Up About Body Shaming Experience

May 18, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Mexico’s ‘cathedral of football’, the stadium Maradona never really left | Football News

June 12, 2026

MAGA Pastor Fumes Over Obamas ‘Anti-Christian’ Library

June 12, 2026

What To Know After His Hospitalization

June 12, 2026

Brain chemical surge may help break old habits, study finds | Technology News

June 12, 2026
Popular Post

Brandi Granville Undergoes Life-Saving Breast Implant Surgery

On his first overseas trip, Shelton is living the dream

Kamala Harris Confronted During Historic Visit to Abortion Clinic

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.