Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»BBMP proposes white-topping 39 more roads in Bengaluru at a cost of Rs 1,449 crore
Local News

BBMP proposes white-topping 39 more roads in Bengaluru at a cost of Rs 1,449 crore

November 13, 2022No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Bruhat Bengaluru Mahanagara Palike (BBMP) has sought approval from the federal government to white-top 39 extra roads, stretching throughout 114.46 km within the metropolis, at an estimated value Rs 1,449 crore, officers stated.

This would be the third section of the white-topping mission in Bengaluru. A proposal on this regard was not too long ago submitted to the state authorities searching for nod and funds for the street infrastructure mission, they added.

Among the many key roads that will probably be white-topped are the Outer Ring Highway (ORR) from Silk Board to KR Puram, Hennur Principal Highway, Horamavu Agara Highway, Kaggadasapura Principal Highway, Kammanahalli Principal Highway, Ulsoor Lake Highway, New Thippasandra Principal Highway, Indiranagar Double Highway, Indiranagar twelfth Principal Highway and Interior Ring Highway at Yeshwanthpur, amongst others.

Below the primary two phases of the mission, work on round 143 km of roads within the metropolis is nearing completion. Within the first section, 94 km was lined at a price of Rs 972 crore, whereas within the second section, 49 km was white-topped at a price of Rs 704 crore.

This would be the largest section of white-topping to be taken up by the town, regardless of the state authorities’s intention to evaluation the mission owing to its excessive value. In March this 12 months, Chief Minister Basavaraj Bommai advised the Legislative Meeting that whereas asphalting prices Rs 75 lakh to Rs 1 crore per kilometre, white-topping incurs anyplace between Rs 9-10 crore for a similar.

Roads to be white-topped

Outer Ring Highway (ORR) from Central Silk Board to KR Puram (19 km) at a price of Rs 228 crore
Hennur Principal Highway (6.6 km) – Rs 79.2 crore
Horamavu Agara Highway – Kalkere street (2.9 km) – Rs 72 crore
Marenahalli Principal Highway (5.5 km) – Rs 66 crore
Dr BR Ambedkar Highway, ORR (5 km) – Rs 60 crore

Horamavu Principal Highway (5 km) – Rs 60 crore
MCEHS Highway, Jakkur (4 km) – Rs 48 crore

Kogilu Highway from Tippu Circle (3.7 km) – Rs 44.40 crore

Interior Ring Highway from ORR to Tumkur Highway (3.2 km) – Rs 38.40 crore
ninth Cross Highway, JP Nagar (3 km) – Rs 36 crore
Wheelers Highway (3 km) – Rs 36 crore
Yelahanka Jakkur Principal Highway (2.95 km) – Rs 35.40 crore
Banaswadi – Ramamurthy Nagar Highway (2.9 km) – Rs 34.80 crore
Kaggadasapura Principal Highway (2.6 km) – Rs 31.20 crore

Kammanahalli Principal Highway (2.5 km) – Rs 30 crore
Indiranagar Double Highway (2.5 km) – Rs 30 crore
ninth Principal Highway from Marenahalli Highway (2.5 km) – Rs 30 crore
Kannur Principal Highway (2.10 km) – Rs 25.20 crore
Bagalur Principal Highway as much as Thanisandra Highway (2 km) – Rs 24 crore
twenty eighth Principal Highway from forty fifth cross to ORR (2 km) – Rs 24 crore
Kanteerava Studio Principal Highway (2 km) – Rs 24 crore

Avalahalli Principal Highway (2 km) – Rs 24 crore
Ulsoor Lake Highway (2 km) – Rs 24 crore
New Thippasandra Principal Highway (1.9 km) – Rs 22.80 crore
Jeevanbhima Nagar Principal Highway (1.8 km) – Rs 21.60 crore
Ullal Principal Highway (1.80 km) – Rs 21.60 crore
MEI Highway from ORR to Tumkur Highway (1.75 km) – Rs 21 crore
18th Principal Highway from thirty second Principal Highway, East Finish Highway (1.7 km) – Rs 20.40 crore

Kempegowda Highway (1.7 km) – Rs 20.40 crore
Nethaji Highway (1.5 km) – Rs 18 crore
MM Highway (1.5 km) – Rs 18
1st Principal Highway from forty fifth cross to JSS Circle (1.40 km) – Rs 16.80 crore
Interior Ring Highway, Yeswanthpur (1.3 km) – Rs 15.60 crore
Indiranagar twelfth Principal (1.2 km) – Rs 14.40 crore
Ejipura Principal Highway (2.70 km) – Rs 13.50 crore

Remaining areas on East Finish Principal Highway (1 km) – Rs 12 crore
4th essential Goraguntepalya (0.68 km) – Rs 8.1 crore
Raja Industrial Highway (0.48 km) – Rs 5.76 crore
Junction enhancements – Rs 95 crore

Complete – Rs 1,449.62 crore



Source link

BBMP Bengaluru cost crore proposes roads whitetopping
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Solving Crime: How a woman’s murder probe led Karnataka cops to a ‘Drishyam’-inspired crime that stayed hidden for 5 years | Bangalore News

June 7, 2025

Karnataka HC poses 9 questions to govt on Bengaluru stampede: ‘Who took decision to hold RCB celebration?’ | Bangalore News

June 7, 2025

Bengaluru stampede: Karnataka HC shields state cricket body officials from arrest, denies relief to RCB marketing head | Bangalore News

June 7, 2025

Katra rail link inauguration | Magnitude of bridge hits when you see it in real: IISc expert | Bangalore News

June 7, 2025
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Broadcom Slips After Earnings Beat, Drags Down Tech ETFs

June 8, 2025

Internet snapped in 5 Manipur districts, curfew in Bishnupur amid protests over Meitei leader’s ‘detention’ | India News

June 8, 2025

‘My manager had to do interventions’: Nora Fatehi reveals how her unchecked shopping sprees impacted her bank account | Lifestyle News

June 8, 2025

How a Pat Cummins picture with TV host Jeremy Clarkson got Aussie, English fans throwing sandpaper, Murray Mints online disses at each other | Cricket News

June 8, 2025
Popular Post

RTD officially kills its long-suspended C and F lines to south suburbs

This drug in US is turning people into ‘zombies’. Symptoms include skin rotting | World News

Elon Musk takes over Twitter: A look back on timeline of $44 billion deal

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2025 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.