Close Menu
  • Homepage
  • Local News
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
  • Business
  • Technology
  • Health
  • Lifestyle
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
Facebook X (Twitter) Instagram Pinterest
JHB NewsJHB News
  • Local
  • India
  • World
  • Politics
  • Sports
  • Finance
  • Entertainment
Let’s Fight Corruption
JHB NewsJHB News
Home»Local News»Hosur flyover shut after developing lateral shift; closure leads to 3-km traffic jam on Bengaluru-Chennai highway | Bangalore News
Local News

Hosur flyover shut after developing lateral shift; closure leads to 3-km traffic jam on Bengaluru-Chennai highway | Bangalore News

June 22, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

In a serious concern, the Hosur elevated expressway that connects Bengaluru and Chennai has developed a lateral shift —a harmful horizontal displacement of the street’s structural alignment – main officers to shut the street on Saturday. The closure has led to congestion, with visitors jams extending as much as 3 km close to the Hosur bus stand.

On Saturday, Nationwide Freeway Authority of India (NHAI) chief engineer Prasanna Kumar and different officers inspected the flyover and ordered its closure, in addition to suspending all vehicular motion on it. The affected stretch is a part of the very important Bengaluru-Chennai Nationwide Freeway hall, serving as an important hyperlink between the 2 main cities.

Autos from Salem and Chennai heading to Bengaluru through Krishnagiri can not use the elevated route, forcing them to take various roads. Presently, visitors is being diverted to the service street that runs parallel to the primary freeway.

Story continues beneath this advert

Engineering specialists are scheduled to examine the broken construction on Sunday to find out the precise reason for the lateral shift and assess restore necessities.

The street was inaugurated in 2010 and roughly 50,000 automobiles take the elevated flyover. The Hosur flyover is especially necessary because it connects Silk Board Junction to Electronics Metropolis, Bengaluru’s main IT hub, and was particularly constructed to cut back visitors congestion on this busy route.



Source link

3km Bangalore BengaluruChennai closure developing flyover highway Hosur jam lateral Leads news shift shut Traffic
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

‘I’d like little more honesty’: Naseer Hussain tells England cricket think tank | Cricket News

June 30, 2026

Naomi Osaka channels iconic ‘Kill Bill’ character with Wimbledon walkout outfit | Tennis News

June 30, 2026

Tech updates (June 29, 2026): Samsung Galaxy M47, Infinix Note 60 Pro, Salesforce, DashORM, and more | Technology News

June 30, 2026

Gabriel Martinelli is Brazil’s saviour as last-gasp goal breaks Japanese hearts | Football News

June 30, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Lock in up to 4.10% APY

June 30, 2026

‘I’d like little more honesty’: Naseer Hussain tells England cricket think tank | Cricket News

June 30, 2026

Michael Jackson’s Alleged Secret Stash ‘Exposed’

June 30, 2026

Pixel 10a Even Cheaper Than Amazon Prime Day Deal

June 30, 2026
Popular Post

Big Tech’s Q1 2025 earnings: Do they confirm fears of a pullback in AI spending? | Technology News

Trump’s Florida Compound is Being Patrolled By Robot Dogs

At Karnataka Chitrakala Parishath, artists from across India put their talent on display | Bangalore News

Subscribe to Updates

Get the latest news from JHB News about Bangalore, Worlds, Entertainment and more.

JHB News
Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 Jhb.news - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.